Sök:

Sökresultat:

4398 Uppsatser om Project efficiency - Sida 1 av 294

Effektiviseringspotential inom projekt

The work is performed at Forsmark Group AB as a final step in the Bachelor ofScience program in nuclear engineering at the University of Uppsala in 2013.The work is part of an ongoing process of streamlining project system model FKA.Streamlining the project model is an important aspect that affects all largecompanies that somehow have a project governing body when there is muchfinancial resources to save. Although the quality of the projects is positivelyaffected by efficiencyThe aim is to find possible common weaknesses and strengths of the project systemby interviewing a number of project managers, and using the systems in placeexamine the model.As part of the work also includes examining what project managers have to adjust tothe newly implemented system VPMM, and other newly introduced elements thathave been added to improve the efficiency in the futureProject System is a complex system that is influenced by many different parametersand participating individuals' attitude and personality. But then small changes in themodel could have major economic consequences.The thesis has generated results that show common weaknesses among the variousprojects and their project managers' general opinions about the project model. It alsopresents some possible solutions based on own thoughts and those interviewedobjects suggestions and comments..

Elektromagnetisk och mekanisk design av en 20MW turbogenerator

At the Division of Electricity at UppsalaUniversitythere are ongoing researches, including a research concerning turbo generators.Turbo generators produce a large share of electricity in the world; however they are costly mainly due to the fact that the cooling and ventilation that are needed to eliminate the excess heat from the generators are expensive. Turbo generators work with high efficiency and in this project, the main task is to simulate a generator while taking into account that the generator must be designed against self-oscillation, centrifugal force, exhaustion and heat. The turbo generator must be simulated without being too expensive and complicated.In this project, the dimensions of the turbo generator depend on the efficiency of it, and where the losses are in the generator. Furthermore, the optimum values need to be chosen with the help of the ACE simulation program. The report begins with an introduction describing the project followed by a task description that is dealing with the project.

Projekteffektivitet inom tekniska utvecklingsprojekt : Vilka faktorer påverkar projekteffektivitet och hur kan dessa mätas?

The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for Project efficiency and effectiveness.

Effektivisering av pulverlackeringslinje med inriktning på fixturer

The project has been oriented for development of fixtures to ateljé Lyktan to provide a more efficiency line. In the year 2012 the company invested in a new coating booth, which leads to opportunities to upgrading the fixtures and also new design. The request is to minimize the area for storage of fixtures, and therefore should fixtures be designed to apply as many articles as possible The priority of products that fixtures have development to has been products that are most frequently coated and new products that don?t have any fixtures. The product families that the project has been having focus on is TIME and FOVEA with RONDO.

Plattform Göteborg : En utvärdering av ett integrationsprojekt i Göteborg

In 2005 the Swedish government introduced a law of amnesty for refugees in the country which made the Minister of Integration invite a number of national organizations to discuss this law. After that, seven organizations in Gothenburg also felt that something should be done and they started talking about a cooperation to improve the situation for newly arrived people to Gothenburg. They formed a project, ?Plattform Göteborg?, which in this paper will be evaluated according to a manual from Sida. The project consists of seven organizations which have their separate activities formed by them to improve the integration.

Mätsystem för effektförluster i en högfrekvenstransformator

To measure losses in a transformer with today?s methods is either slow or insecure. There s a new method developed by Alstom that hasn't been actualize in to a test-system and that has been the assignment in this project. The idea is built on a switched system and a CLR- circuit in the resonant frequency. The test-system has a calculated power-loss that make the efficiency to be as high as 99,8% and in reality over 95%.

Effektivisering av pulverlackeringslinje med inriktning på fixturer

The project has been oriented for development of fixtures to ateljé Lyktan to provide a more efficiency line. In the year 2012 the company invested in a new coating booth, which leads to opportunities to upgrading the fixtures and also new design. The request is to minimize the area for storage of fixtures, and therefore should fixtures be designed to apply as many articles as possible The priority of products that fixtures have development to has been products that are most frequently coated and new products that don?t have any fixtures. The product families that the project has been having focus on is TIME and FOVEA with RONDO. In the developing of fixtures have ideas been discussed with the staff, and instructions were made about how you are suppose to hang up the different products.

Ta bort tidstjuvarna! : Om tidsbesparande effektiviseringsåtgärder inom det kommunala bostadsföretaget Gavlegårdarnas byggprojekt

AbstractThe development of the construction industry is slower compared to other industries. This implies that there must be improvements in this field. One step to increased effectiveness in construction projects is making the construction process more efficient, therefore resulting in a positive result for both the actual construction project and for the overall branch. The purpose of this study is to identify areas for improvement within the municipal housing company Gavlegårdarna completed construction project, who will then contribute to increased efficiency in their upcoming projects. The work has been performed with the help of two case studies examine construction projects "Fullriggaren" and "The three nursing homes." Opinions about what could have improved the efficiency of these construction projects further have been collected with the help of an interview study among some of the project participants involved in both projects.There have been many studies addressing the topic of how the construction process can be streamlined and similar studies that have been previously conducted.

Problematiken kring ett energieffektiviserande projektförslag i en kommunal organisation

When it comes to the priority of a project proposal, a variety of factors is affecting theoutcome. In the municipal sector, factors of non- economic nature appears to be particularlyimportant when the organization is not intended to be profit-making.This study's research question is What problems can occur around an energy-efficiencyproject proposal in a municipal organization? The purpose of this study is to gainunderstanding of what possible problems an energy efficiency project proposal mayencounter, in the municipal implementation process as well as the problems of a changingownership can bring.To conduct this study, the method was qualitative in nature. We have cooperated withVarberg Energi AB and Varberg kommun, which has stood as respondents for the empiricalbasis of the study. In this study, we have conducted four personal interviews.In this study, we have found that there may be several problematic factors associated with anenergy-efficiency project proposal in a municipal organization.

Design for assembly

The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for Project efficiency and effectiveness.

Make or buy-analys

The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for Project efficiency and effectiveness.

SPICE UP APQP

The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for Project efficiency and effectiveness.

UTVECKLING AV SUPPORTARMFÖR PARALLELLA INSTALLATIONER

The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for Project efficiency and effectiveness.

Framtagning av smyckeskollektionfrånidé till marknad

The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for Project efficiency and effectiveness.

En analys av vagnparksplaneringen i etthyrbilsföretag utifrån ett leanperspektiv.

The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for Project efficiency and effectiveness.

1 Nästa sida ->